Choosing ACCC (Aluminum Conductor Composite Core) conductor offers several advantages, especially for power transmission projects where efficiency, capacity, and long-term performance are key. Here's why engineers and utility companies often prefer ACCC:

🔹 1. Higher Current Carrying Capacity

ACCC conductors can carry twice the current of traditional conductors like ACSR of the same diameter, thanks to their advanced composite core and superior aluminum strands.

🔹 2. Low Line Losses

They reduce electrical resistance, which means less energy is lost as heat. This translates to:

Lower operating costs

Improved grid efficiency

Reduced carbon emissions

🔹 3. Minimal Thermal Sag

The composite core has a very low coefficient of thermal expansion, so it sags much less under high temperatures. This is critical in hot climates or under heavy load conditions.

🔹 4. Lightweight Yet Strong

ACCC conductors are lighter than steel-core conductors but offer superior tensile strength, making them ideal for long spans or rugged terrain where fewer towers are desired.

🔹 5. Excellent Corrosion Resistance

The composite core doesn’t rust, and the aluminum strands are often fully annealed and corrosion-resistant, ensuring long service life even in coastal or industrial environments.

🔹 6. Easy Retrofit for Existing Lines

Since ACCC conductors can fit into existing towers, utilities can upgrade transmission capacity without replacing infrastructure, reducing project costs and downtime.

🔹 7. 환경 친화적

Improved efficiency and lower losses contribute to greener power delivery, helping utilities meet sustainability goals.

👨‍🚀 Pourquoi choisir le chef d&39;orchestre ACCC ? 2

prev
Choosing a 0.6/1kV SWA cable (Steel Wire Armoured cable) is often the go-to solution for many low voltage power applications, especially in harsh environments. Here are some solid reasons why:-1744965345031965
Étape importante : les câbles KINGYEAR AAAC et OPGW arrivent sur le site du projet au Pérou, marquant une nouvelle phase dans la modernisation des lignes électriques
suivant
Recommandé pour vous
pas de données
Prenez contact avec nous
Prêt à travailler avec nous ?
Retrouvez-nous ici: 
L'usine de câbles de 2007 à 2018 est principalement destinée à la négociation et au traitement intérieures à certains companies d'exportation. Le montant moyen des ventes est d'environ 320 000 000 RMB par an. Pour le marché des câbles à l'étranger, depuis mai dernier, nous avons étendu notre marché à la Bolivie, au Pérou, à la République dominicaine, aux Philippines, au Vietnam, à la Thaïlande, à l'Irak, à la Mongolie, à l'Indonésie et à certains pays d'Afrique. 
Customer service
detect